lu.ca/calc/

Tunnelling-induced settlement

Export

Margins

MS = limiting strain ÷ strain in the building − 1. Zero or more passes. Point at a check to see how it fails.

Plan: the settlement bowl

contours of settlement as the face advances; drag the machine

Along the tunnel

settlement over the axis and under the building against distance; drag the face

Across the tunnel

settlement, horizontal displacement and strain across the trough

Damage category

deflection ratio against horizontal strain for this building's proportions

Calculation

every step with this tunnel's numbers

Sources and assumptions