The installed support against the Q-system chart: MS = installed ÷ needed − 1 (bolt spacing: needed ÷ installed − 1). Guidance rows do not govern. Point at a row to see what it guards against.
Support chart
Three systems, one rock mass
each rating from its own table; the correlations are a cross-check, not a substitute