lu.ca/calc/

Gravity sewer and detention

Export

Margins

MS = allowable ÷ actual − 1, or actual ÷ required − 1 for the minima; guidance rows do not govern. Point at a check to see how it fails.

Part-full pipe

Peak flow and capacity along the run

Calculation

every step with these numbers

Sources and assumptions