lu.ca/calc/

Construction dewatering

Export

Margins

MS = provided ÷ required − 1. Zero or more passes. Point at a check to see how it fails.

Section through the pit

the lowered water table across the pit

Drawdown against time

Theis at the pit's least drawn-down point; drag the time

Calculation

every step with this pit's numbers

Sources and assumptions