lu.ca
/
calc
/
Surface finish
Export
PDF
PNG
Copy
µin, in.
µm, mm
ISO 4287 / 4288
ASME B46.1
Examples
↶
↷
Margins
MS = limit ÷ value − 1 for an upper limit, value ÷ limit − 1 for a lower one. Point at a row to see what it checks.
What each process reaches
Ra by process, ASME B46.1-2019 Fig. B-2-1; drag the line
Material ratio curve
Abbott–Firestone curve of this profile with the Rk construction; drag the line
Conversions
any value in any system; click a value to copy it
The symbol, spot by spot
point at any part; build your own below
Calculation
every step with this profile's numbers
Sources and assumptions